§ KONT-OPS-005

DOCS · OPERATIONS

Design Standards & Building Code

Internal Building Code for All Kont Cooperative Settlements

KONT-OPS-005 · v1 · UPDATED 2026-04-10 · AHMET TURETMIS, FOUNDER · APPROVED


§ CONTENTS

Preamble: How to Read This Document

This document establishes the minimum physical design standards for every Kont settlement. It is organized as a series of measurable specifications grouped by building system. Each specification states a requirement, a numeric value, and a brief rationale.

Three Compliance Levels

MANDATORY — Must be built from day one. No exceptions. These represent permanent infrastructure decisions that cannot be cost-effectively retrofitted. Failure to comply invalidates the design.

RECOMMENDED — Strong design preference. May be modified with documented justification approved by the settlement council. Modifications must achieve equivalent performance by alternative means.

FUTURE-READY — Design for future installation. The physical accommodation (structural capacity, conduit, connection point, reserved space) must be provided from day one, but the system itself may be installed later when economically viable.

How Standards Relate to Local Code

Where a Kont standard exceeds local building code, the Kont standard governs. Where local code exceeds the Kont standard, local code governs. In no case may a Kont specification reduce safety below local code requirements.

All numeric ranges are expressed as minimum–target. The minimum is the compliance threshold; the target is the design optimum. Design teams should aim for the target and justify any value below it.


1. Structural Standards

Specification Value Compliance / Rationale
1.1 Seismic design factor (Türkiye) 1.5× TBDY 2018 code MANDATORY — 2023 Kahramaraş proved code-minimum is insufficient. Over-design by 50%.
1.2 Seismic design factor (UAE) 1.25× local code MANDATORY — Lower seismic zone but 100-year design life requires margin.
1.3 Foundation design for vertical expansion Capacity for +1 floor lightweight MANDATORY — All foundations and columns sized for additional storey of steel/timber frame (max 6 kN/m² imposed). Cost premium: 8–15% of structural frame.
1.4 Knock-out slab provisions At roof level for future stairs/lift FUTURE-READY — Clearly marked zones in roof slab with reduced reinforcement for easy removal. Min 1.5m×2.5m per building for future stair/elevator core.
1.5 Structural grid (commercial/shared) 6×9 m or 7.2×7.2 m MANDATORY — Universal grid enables conversion between uses over decades (coworking → maker lab → care facility → classroom). Column-free internal spans.
1.6 Structural grid (residential) Min 5.4 m clear span RECOMMENDED — Allows unit reconfiguration from studio (30 m²) to family (120 m²) without column interference.
1.7 Design service life ≥100 years (structure), ≥50 years (envelope), ≥25 years (services) MANDATORY — Cooperative settlement is multi-generational. Short-life structures are prohibited.
1.8 Concrete cover to reinforcement +10 mm above code minimum MANDATORY — Extends carbonation protection for 100-year service life. Applies to all exposed/buried concrete.
1.9 Structural monitoring provisions Sensor conduit at foundations + primary beams FUTURE-READY — 50 mm conduit at each column base and mid-span of primary beams for future accelerometers and strain gauges.

2. Floor-to-Floor Heights and Vertical Expansion

Specification Value Compliance / Rationale
2.1 Residential floor-to-floor ≥3.6 m (min 3.4 m) MANDATORY — Allows thermal stratification (hot air rises above occupied zone), future ceiling-mounted radiant cooling panels, mezzanine insertion in tall units, and enhanced HVAC ducting.
2.2 Commercial / shared floor-to-floor ≥4.2 m (min 3.9 m) MANDATORY — Accommodates workshop equipment, overhead cranes in maker space, suspended services, future function change.
2.3 Minimum clear ceiling height (residential) ≥2.7 m finished MANDATORY — After services zone. Exceeds most national codes (typically 2.4–2.5 m).
2.4 Minimum clear ceiling height (shared) ≥3.0 m finished MANDATORY — Large communal spaces (dining, hall, workshop) feel institutional below 3.0 m.
2.5 Service void depth (floor/ceiling) ≥300 mm MANDATORY — Between structural slab and finished ceiling. Houses HVAC, electrical, plumbing, data. Accessible for future modifications.
2.6 Roof dead load reserve ≥25–30 kg/m² FUTURE-READY — For future rooftop solar thermal, additional radiative cooling, water harvesting, or green roof systems beyond initial installation.

3. Universal Design and Accessibility

All specifications apply to every dwelling unit and every shared space from day one. Universal design is the default, not an accommodation. Kont’s founding cohort will age in place; 30–40% of residents may be over 60 within four decades.

Specification Value Compliance / Rationale
3.1 Dwelling entries Zero-step (max 15 mm threshold) ramp ≤1:20 gradient MANDATORY — All entries at grade or with integrated ramp. No step at any entry point.
3.2 Door widths (all doors) ≥900 mm clear opening clearance MANDATORY — Standard wheelchair + walker. Applies to entry, bedroom, bathroom, all internal doors.
3.3 Corridor widths (common buildings) ≥1,500 mm clear MANDATORY — Two wheelchairs must pass. At turning points, ≥1,800 mm.
3.4 Corridor widths (residential internal) ≥1,050 mm clear MANDATORY — Walker + person passing. Exceeds most residential codes.
3.5 Bathroom wall reinforcement 18 mm plywood blocking behind all wall finishes MANDATORY — Permits future grab bar installation at any point without structural work. All bathrooms, all units.
3.6 Shower provisions Curbless shower in at least 1 bathroom per unit MANDATORY — Level-access shower with linear drain. Floor gradient 1:50 to drain.
3.7 Hardware throughout Lever handles on all doors and windows MANDATORY — No round knobs anywhere. Operable with closed fist.
3.8 Kitchen counter heights Variable: 850 mm standard + one section at 750 mm RECOMMENDED — Lower section accommodates seated users. In common kitchen: at least 2 work stations at 750 mm.
3.9 Path gradients (all outdoor) ≤5% (1:20), cross-slope ≤2% MANDATORY — All paths, spine, and neighborhood loops. Where terrain requires steeper, provide parallel accessible route.
3.10 Lift provision (2+ storey buildings) Shaft built, lift installed if ≥3 storeys MANDATORY — All 2-storey buildings: lift shaft constructed with structural provisions. Lift installed in buildings ≥3 storeys. Shaft min 1.6 m × 1.6 m internal.
3.11 Signage and wayfinding High-contrast, min 30 mm letter height, tactile at decision points RECOMMENDED — Consistent system across settlement. Braille on room identifiers.
3.12 Lighting levels (paths/circulation) ≥20 lux min, ≥50 lux at intersections/stairs MANDATORY — Low-energy bollard lighting. Older eyes need 2–3× more light than younger.

4. Adaptable Housing: Open Building Standards

All residential buildings must follow the Open Building framework: permanent structural ‘support’ separated from changeable ‘infill’. This enables unit reconfiguration from 30–120 m² without touching the structure, across the 100-year service life.

Specification Value Compliance / Rationale
4.1 Support-infill separation Required in all residential buildings MANDATORY — Load-bearing structure, stairs, and primary services are permanent. Interior partitions, finishes, kitchens, and non-structural bathrooms are changeable.
4.2 Demountable partition systems STC ≥50, relocatable without wet trades MANDATORY — Interior walls between rooms within a unit must be relocatable. Acoustic performance maintained through proprietary demountable systems or detailed stud-and-board with resilient channels.
4.3 Vertical service chases ≥300 mm × 600 mm at each structural bay MANDATORY — Accessible from both sides. Houses water, waste, electrical, and data risers. Permits kitchen/bathroom relocation without slab penetration.
4.4 Horizontal service zone ≥300 mm between structural slab and finished floor/ceiling MANDATORY — Raised floor or suspended ceiling zone for horizontal pipe and cable runs. Accessible panels at regular intervals.
4.5 External access points per unit ≥2 (primary entry + balcony/terrace) MANDATORY — Enables future unit subdivision. Each sub-unit must have independent external access.
4.6 Wet-point connection density 1 wet-point stub per 25 m² of floor area RECOMMENDED — Capped water/drain connections in service zone. Permits future bathroom/kitchen relocation without new slab penetration.
4.7 Electrical distribution per unit ≥10 kW per unit, 3-phase ready MANDATORY — Accommodates future heat pump, EV home charging, home workshop. Sub-panel in each unit with spare capacity for 6+ circuits.
4.8 Unit size range without structural change 30 m² to 120 m² RECOMMENDED — The planning grid must permit studio, 1-bed, 2-bed, 3-bed, and combined-unit configurations through partition changes only.

5. Building Envelope and Thermal Performance

Türkiye (Aegean / Central Anatolia)

Specification Value Compliance / Rationale
5.1 Wall U-value ≤0.35 W/m²K (Aegean) / ≤0.28 W/m²K (C. Anatolia) MANDATORY — Exceeds TS 825 by 20–30%. Accounts for +2.5°C warming by 2050.
5.2 Roof U-value ≤0.20 W/m²K MANDATORY — Roof receives highest solar gain. Critical for both heating and cooling seasons.
5.3 Glazing U-value ≤1.4 W/m²K, SHGC ≤0.35 (S/W/E faces) MANDATORY — Low-e double or triple glazing. Argon fill minimum. N-facing may relax SHGC to 0.50.
5.4 Window-to-wall ratio 20–30% (S/E/W), up to 40% (N) RECOMMENDED — Balance daylight with thermal performance. Deep reveals (≥300 mm) for self-shading.
5.5 Thermal mass (wall) ≥300 kg/m² exterior wall masonry RECOMMENDED — Stone, rammed earth, or heavy masonry. 10–15°C diurnal swing in C. Anatolia makes thermal mass highly effective.
5.6 Airtightness ≤3.0 ACH @ 50 Pa (blower door) MANDATORY — With mechanical ventilation (see Section 6). Prevents uncontrolled infiltration in both hot and cold extremes.
5.7 External shading All S/E/W windows fully shaded at summer solstice MANDATORY — Fixed overhangs, operable louvers, or deciduous planting. Must block direct sun Jun–Aug while admitting Dec–Feb sun.
5.8 Facade BIPV attachment points Structural rails/brackets on all S-facing facades FUTURE-READY — Allows future building-integrated PV cladding without scaffolding or structural retrofit. Cable pathways from facade to inverter room.
5.9 Cool roof / high-albedo surfaces SRI ≥78 on all non-vegetated flat roofs MANDATORY — Reduces cooling load 10–15%. White or light-colored membrane/coating.

UAE Amendments — See Also Appendix A

Wall U-value ≤0.57, roof ≤0.30, glazing ≤1.9, SHGC <0.25 on E/W. Meet Estidama Pearl 2+ or Al Sa’fat Silver. Window-to-wall ratio 15–25% on E/W. Airtightness ≤2.0 ACH@50Pa. All external glazing to include mashrabiya or deep screen for cultural and thermal performance.


6. Ventilation, Air Quality, and Pandemic Resilience

Specification Value Compliance / Rationale
6.1 Ventilation rate (dwellings) ≥0.5 ACH continuous + boost to 4 ACH MANDATORY — MVHR (heat/energy recovery ≥75%) for continuous ventilation. Boost mode for cooking, bathing, or pandemic isolation.
6.2 Ventilation rate (common spaces) ≥6 ACH in dining/meeting; ≥10 ACH in kitchen MANDATORY — Pandemic-grade ventilation in all gathering spaces. Reduces aerosol transmission risk 80%+.
6.3 Filtration (shared HVAC) MERV-13 minimum on all recirculation air MANDATORY — Captures 85%+ of 1–3 μm particles. Filter housing must accommodate upgrade to HEPA (MERV-17) without ductwork changes.
6.4 CO₂ monitoring Sensor in every room >15 m² in shared buildings MANDATORY — Real-time display. Automatic ventilation boost when CO₂ exceeds 800 ppm. Alert at 1,000 ppm.
6.5 Operable windows in all occupied spaces Min 5% of floor area openable MANDATORY — Natural ventilation as primary strategy when outdoor conditions permit. Cross-ventilation paths in all common rooms.
6.6 Common house HVAC zoning Guest rooms on independent HVAC zone MANDATORY — Permits quarantine isolation without shutting down common house. Separate exhaust, no recirculation to other zones.
6.7 UV-C disinfection provision Power + mounting points in HVAC plenums FUTURE-READY — Upper-room UV-C or in-duct UV-C. Conduit and mounting structure installed; units added when needed.
6.8 Dwelling independence for quarantine Every unit: private kitchen, private bathroom, private outdoor MANDATORY — Each unit must be capable of 14-day self-isolation without accessing any shared facility. Even studios must have minimal kitchenette and bathroom.

7. Water Infrastructure

Specification Value Compliance / Rationale
7.1 Dual water distribution Potable + technical-grade (grey/rain) piping throughout MANDATORY — Separate pipe networks from day one. Technical water for toilet flushing, irrigation, laundry. Cannot be cost-effectively retrofitted.
7.2 Main distribution ring capacity 3× initial demand MANDATORY — Accommodates population growth, climate-driven consumption increases, and future productive landscape expansion.
7.3 Potable water storage ≥5-day buffer (0.12 m³/person) MANDATORY — Underground tanks. At 450 ppl: ~270 m³. Protects against supply interruption.
7.4 Rainwater harvesting (Türkiye) ≥2 m³ cistern per m³ roof area × annual rainfall/1000 MANDATORY — First-flush diversion. Connected to technical water network. Underground or semi-buried.
7.5 Greywater treatment All shower/basin/laundry water treated and reused MANDATORY — Biological treatment to non-potable standard. Reused for irrigation and toilet flushing.
7.6 Constructed wetland area 4–6 m² per person equivalent MANDATORY — Hybrid subsurface flow CW. At 450 ppl: 1,800–2,700 m². +40% buffer zone around CW.
7.7 Desalination connection stub (UAE) Piped connection point at energy building FUTURE-READY — Power supply (50 kW), intake/brine discharge routes, and building pad (30 m²) for future solar-powered RO or electrodialysis unit.
7.8 Smart water metering At every building entry + zone boundary MANDATORY — Real-time consumption data to digital twin. Leak detection. Per-neighborhood billing split.
7.9 Fire water reserve Per local fire code (min 60 min supply at required flow) MANDATORY — Integrated with rainwater cisterns where code permits. Separate fire hydrant network on settlement spine.

8. Energy Infrastructure

Specification Value Compliance / Rationale
8.1 Solar PV capacity at full build ≥1.5 kWp per person MANDATORY — At 450 ppl: ≥675 kWp. Mix of rooftop, carport, and ground-mount. South-facing ±15°.
8.2 All south-facing roofs solar-ready Structural capacity, conduit, inverter space MANDATORY — Roof structure rated for panel dead load (≥15 kg/m²). DC cable conduit from roof to inverter room. Inverter room at ground level per building.
8.3 Battery storage capacity (initial) ≥4 hours average daily load MANDATORY — LFP chemistry. At 450 ppl: ~2–4 MWh. Located in dedicated energy building with ventilation and fire suppression.
8.4 Battery pad sized for future expansion 2× initial footprint FUTURE-READY — Foundation, cable conduit, and ventilation for double initial battery capacity. Accommodates cost declines and demand growth.
8.5 Iron-air / long-duration storage pad 50 m² ground-level pad with utility connections FUTURE-READY — For future iron-air batteries ($20/kWh, 100+ hr). Power, water, ventilation connections pre-installed. System installed when cost-effective.
8.6 Ground-source heat pump bore-field 50–100 boreholes, 100–150 m depth MANDATORY — Must be installed before buildings constructed above. Under parking, playing fields, or agricultural land. COP 4–6. District thermal loop to all buildings.
8.7 District thermal distribution Insulated pipe loop connecting all buildings MANDATORY — 4-pipe system (hot supply, hot return, cold supply, cold return). Enables shared GSHP, future waste heat recovery, solar thermal integration.
8.8 EV charging (all parking spaces) Pre-wired for Level 2 (7 kW) MANDATORY — Every parking space: conduit + cable rated for 7 kW. Initial active chargers on 30–50% of spaces. Remaining activated as demand grows.
8.9 Bidirectional (V2G) charging Min 30% of active chargers FUTURE-READY — Switchgear and wiring to support V2G-capable bidirectional power flow. Shared EV fleet as distributed battery (750 kWh–2 MWh).
8.10 Energy sub-metering Per circuit in every building MANDATORY — Real-time consumption data to digital twin. Enables demand response, waste identification, democratic resource governance.
8.11 Industrial electrical capacity (maker spaces) 3-phase, ≥100A per bay MANDATORY — Compressed air lines, extraction ducting, floor drains. Expensive to retrofit; cheap to install during construction.

9. Digital and Data Infrastructure

Specification Value Compliance / Rationale
9.1 Fiber backbone to every dwelling Single-mode fiber, min 2 strands per unit + 2 spare MANDATORY — Fiber’s bandwidth ceiling (100+ Tbps) makes it the only truly future-proof backbone. Install during construction; impossible to retrofit cost-effectively.
9.2 Spare dark fiber in all conduit runs ≥50% spare capacity MANDATORY — Unused fiber strands for future services, settlement-to-settlement links, or leasing.
9.3 Wi-Fi mesh access points 1 per 200 m² in all shared outdoor spaces RECOMMENDED — Wi-Fi 6E/7. Weatherproof. Powered via PoE from fiber switch. Settlement-wide coverage.
9.4 Server room 15–25 m² climate-controlled, 2–5 kW power budget MANDATORY — On-premise servers for governance platform, member data, digital twin, edge AI. Waste heat recovery to DHW or greenhouse. UPS with 4-hour battery backup.
9.5 Network segmentation Min 4 VLANs: governance, IoT/smart grid, guest, operations MANDATORY — No single compromise cascades from smart meter to governance vote. Firewall between all segments.
9.6 Redundant internet uplink Primary: fiber ISP. Secondary: satellite (Starlink) RECOMMENDED — Satellite failover ensures connectivity during infrastructure disruption. Critical for telemedicine and remote work.
9.7 Embedded sensor network Per Section 9 of Spatial Brief v2.0 MANDATORY — Structural monitoring, water meters, energy sub-meters, air quality (CO₂, humidity, PM2.5) in every common space, occupancy sensors in shared facilities.
9.8 Cable conduit to every room Min 2×25 mm conduit per room for future wiring MANDATORY — Accommodates future sensor additions, home automation, or communication systems not yet invented.

10. Utility Corridors and Service Distribution

Specification Value Compliance / Rationale
10.1 Primary utility corridor (settlement spine) Walk-through: ≥1.8 m height × 1.2 m width MANDATORY — Houses all main distribution: potable water, technical water, sewer, power (LV + future MV), fiber, district thermal. Full standing-height access for maintenance.
10.2 Secondary utility branches (to buildings) Crawl-through: ≥0.9 m × 0.6 m RECOMMENDED — Branches from primary corridor to each building connection chamber. Alternative: direct-buried in marked trenches with access pits every 25 m.
10.3 Spare conduit at regular intervals ≥2×100 mm spare at every 10 m in primary corridor MANDATORY — For technologies not yet invented. A 100 mm conduit costs ~$16/m (€15/m) during construction; cutting a finished slab to add one costs $526+/m (€500+/m). Per the v2.2.0 FX anchor in KONT-FIN-005 §10.2 + §16.3.
10.4 Service connection chambers At every building entry point for all utilities MANDATORY — Standardized plug-and-play interfaces. Accessible without entering the building. Min 1.0 m × 1.0 m × 1.5 m deep.
10.5 Utility corridor lighting and ventilation LED lighting, natural or forced ventilation RECOMMENDED — Safe working conditions. Prevent condensation damage to pipes and cables.
10.6 Pipe and cable labeling Color-coded per ISO 14726 + permanent labels every 5 m MANDATORY — Any technician must identify any pipe/cable without reference documents.

11. Circulation, Mobility, and Emergency Access

Specification Value Compliance / Rationale
11.1 Settlement spine width 4.0–5.0 m paved MANDATORY — Shared pedestrian + e-bike. Smooth surface. Center line marking. Bollard lighting. Reinforced substrate for emergency vehicle access.
11.2 Neighborhood loop width 3.0–3.7 m MANDATORY — Pedestrian-priority, e-bikes at walking speed only. Natural stone or brick paving. Tree-shaded.
11.3 Cluster path width 1.5–2.4 m RECOMMENDED — Pedestrian only. Stabilized gravel or natural stone. Intimate scale.
11.4 Service/perimeter ring width 3.5–4.0 m reinforced MANDATORY — Fire truck access. Electric utility vehicles. Bollard-controlled entry to settlement spine.
11.5 Fire access to every building ≤46 m from fire access road to building exterior wall MANDATORY — Per fire code. 6.1 m clear width, 4.1 m vertical clearance, min 7.6 m turning radius. Non-negotiable.
11.6 E-bike charging hubs 1 per neighborhood + 1 at services core MANDATORY — 8–12 docks per hub with integrated charging. Covered shelter 30–40 m² each. 2 cargo bike bays per hub.
11.7 Shuttle stops Covered bench + shelter, ≥8 m² MANDATORY — ADA accessible. UAE variant: enclosed and climate-controlled.
11.8 Perimeter parking (all EV-wired) 60–100 spaces, ≥150 m from any dwelling MANDATORY — Cars at perimeter, never inside settlement. All spaces pre-wired for Level 2 (per 8.8). Shaded in UAE variant.
11.9 Private bike storage ≥2 covered secure spaces per household, at cluster level MANDATORY — Ground-level, easy access. Includes e-bike charging outlet per 4 spaces.
11.10 Adaptive micro-mobility fleet Include step-through, 3-wheel, and seated options RECOMMENDED — From day one, not added later. Older adults and mobility-impaired members must have micro-mobility access equivalent to able-bodied members.

12. Acoustic and Vibration Control

Specification Value Compliance / Rationale
12.1 Workshop-to-dwelling buffer ≥30 m + dense planting acoustic buffer MANDATORY — Woodworking, metalwork, and FabLab at settlement periphery. 0.3–0.5 ha dense vegetation buffer zone.
12.2 Party wall STC (between dwellings) ≥STC 55 (airborne), ≥IIC 55 (impact) MANDATORY — Exceeds most residential codes by 5–10 points. Communal living fails if neighbors hear each other through walls.
12.3 Demountable partition STC ≥STC 50 MANDATORY — Relocatable walls must still provide meaningful sound isolation. Lab-tested, not manufacturer-claimed.
12.4 Common house dining acoustic treatment RT60 ≤0.8 seconds at 500–2000 Hz RECOMMENDED — 80–100 people dining creates high noise levels. Absorbent ceiling + wall panels. Target: conversation at normal voice across a table.
12.5 Maker space vibration isolation Machine bases on resilient mounts; floating slab if adjacent to occupied space RECOMMENDED — CNC, lathe, and planer vibration transmits through structure. Floating slab or damping pad under each machine.
12.6 Outdoor ambient noise target ≤45 dB LAeq daytime, ≤35 dB LAeq nighttime RECOMMENDED — Village-quiet character. Mechanical plant (pumps, HVAC, generators) enclosed in residential zones with acoustic treatment.

13. Materials, Sourcing, and Circular Design

Specification Value Compliance / Rationale
13.1 Local material sourcing ≥60% by weight from within 100 km radius RECOMMENDED — Reduces embodied carbon, supports regional economy, reduces supply chain vulnerability. Stone, earth, timber, lime from local sources.
13.2 Mechanical connections over chemical connections ≥80% of all connections bolted, screwed, or clipped MANDATORY — Design for disassembly. Buildings are material banks. Adhesives, welds, and wet concrete joints prevent material recovery.
13.3 Material passports Digital record for every building element MANDATORY — Linked to digital twin. Records: composition, origin, performance, installation date, expected service life, disassembly instructions. Madaster platform or equivalent.
13.4 Embodied carbon target ≤500 kgCO₂e/m² for residential, ≤600 kgCO₂e/m² for commercial RECOMMENDED — Measured cradle-to-gate (A1–A3) per EN 15978. Achieved through local stone/timber, mass timber structure, and low-carbon concrete.
13.5 Self-healing concrete Bacterial-spore or crystalline admixture in all below-grade RECOMMENDED — Crack healing for water-contact structures (foundations, cisterns, CW). Extends service life 30–50 years. Approaching commercial viability.
13.6 Bio-based insulation preference Hempcrete, wood fiber, mycelium, or straw bale where structurally viable RECOMMENDED — Carbon-sequestering, hygroscopic (moisture-regulating), fully compostable at end of life. Hempcrete: R-2/inch, good thermal mass.
13.7 Repairability of all installed equipment Right-to-repair compliant; spare parts available MANDATORY — All appliances, HVAC units, pumps, inverters: selected for field-repairability. No proprietary systems requiring manufacturer-only service. 10-year spare parts guarantee from supplier.
13.8 Standardization of building systems Max 3 fixture types, 3 hardware types, 3 pipe sizes RECOMMENDED — Reduces spare parts inventory. Any plumber, electrician, or resident can maintain any building with the same tools and parts.

14. Site-Wide Landscape and Stormwater

Specification Value Compliance / Rationale
14.1 Stormwater design return period 100-year ARI (will become 50-year by 2050) MANDATORY — Climate change increases extreme rainfall intensity 15–30%. Design for today’s 100-year event as tomorrow’s 50-year event.
14.2 On-site stormwater retention First 50 mm of any rainfall event MANDATORY — Permeable paving, bioswales, retention basins, rain gardens. Zero runoff for minor events.
14.3 Finished floor level above grade ≥600 mm in flood-risk areas, ≥300 mm elsewhere MANDATORY — Flash flood protection. Combined with site grading to direct overland flow away from buildings.
14.4 Permeable surface ratio ≥60% of all hard surfaces permeable RECOMMENDED — Reduces runoff, recharges groundwater, replicates pre-development hydrology.
14.5 Built-to-open ratio ≤25:75 (built : productive/natural landscape) MANDATORY — One quarter built, three quarters productive or natural. Preserves village character, productive capacity, and biodiversity.
14.6 Biodiversity corridors ≥1 ha per 150 people as native habitat RECOMMENDED — Unmanaged wild zones for wildlife. Connected to broader landscape ecology. No pesticide use within 50 m.
14.7 Food forest planting in Phase 1 Begin immediately; 10–15 year maturity MANDATORY — Perennial food forest is the slowest productive landscape element to mature. Delay = 10+ years lost production. Plant on day one of site preparation.
14.8 Wildfire buffer (if applicable) ≥30 m defensible space around settlement perimeter MANDATORY — In fire-prone zones: low-fuel vegetation, ember-resistant construction, sealed eaves, mesh over vents. Non-combustible cladding within 10 m of perimeter.
14.9 Shade coverage on pedestrian paths ≥70% of settlement spine shaded RECOMMENDED — Tree canopy, pergolas, or built shade structures. Critical for pedestrian comfort in +2.5°C future. UAE variant: 100% shaded.

Appendix A: UAE-Specific Amendments

The following specifications amend or supplement the base standards for UAE locations. All base standards apply unless explicitly overridden here.

Ref UAE Amendment Rationale
5.1–5.3 Wall U ≤0.57, roof U ≤0.30, glazing U ≤1.9, SHGC <0.25 (E/W). Airtightness ≤2.0 ACH@50Pa. Estidama Pearl 2+ compliance. Meet Al Sa’fat Silver standard.
5.4 Window-to-wall ratio 15–25% on E/W facades, up to 35% N-facing Extreme solar gain on E/W. Northern exposure more favorable.
5.new All external glazing: deep shading or mashrabiya screen (min 300 mm projection) Cultural and thermal performance.
5.new Wind tower (barjeel) provision in communal buildings 10°C reduction without energy consumption. Min 1 per common house.
6.new All shared spaces: AC as emergency third layer (sized for 50°C+ events) Above 45°C passive strategies alone fail.
7.7 Desalination: MANDATORY (not future-ready) UAE water scarcity is immediate, not future risk.
7.new AC condensate recovery: collect and reuse Significant water source in humid coastal areas.
8.1 Solar PV ≥2.0 kWp per person Higher cooling loads demand higher generation.
11.1 Settlement spine: 100% covered with shade structures Outdoor exposure dangerous May–September.
11.7 Shuttle stops: enclosed and air-conditioned Primary inter-neighborhood transport in summer.
11.8 All parking spaces: shade structures with integrated PV Reduces vehicle interior temperature, generates power.
14.5 Productive landscape sized to available reclaimed water, not food targets Water is the binding constraint in UAE.
14.9 100% spine shade coverage (mandatory, not recommended) Outdoor mobility impossible without shade in summer.

Appendix B: Specification Summary Table

Quick reference of all mandatory numeric specifications. For full rationale and compliance requirements, refer to the relevant section.

Ref Specification Value Level
1.1 Seismic design factor (Türkiye) 1.5× TBDY 2018 MANDATORY
1.3 Foundation for vertical expansion +1 floor capacity MANDATORY
1.5 Structural grid (commercial) 6×9 m or 7.2×7.2 m MANDATORY
1.7 Design service life ≥100 yr structure MANDATORY
2.1 Residential floor-to-floor ≥3.6 m MANDATORY
2.2 Commercial floor-to-floor ≥4.2 m MANDATORY
2.5 Service void depth ≥300 mm MANDATORY
3.1 Dwelling entries Zero-step (≤15 mm) MANDATORY
3.2 All door widths ≥900 mm clear MANDATORY
3.3 Common building corridors ≥1,500 mm MANDATORY
3.5 Bathroom wall reinforcement 18 mm plywood blocking MANDATORY
3.9 Path gradients ≤5% (1:20) MANDATORY
4.2 Demountable partition STC ≥50 MANDATORY
4.3 Vertical service chases ≥300×600 mm per bay MANDATORY
5.1 Wall U-value (Aegean) ≤0.35 W/m²K MANDATORY
5.6 Airtightness ≤3.0 ACH@50Pa MANDATORY
6.2 Ventilation (common spaces) ≥6 ACH MANDATORY
6.3 HVAC filtration MERV-13 minimum MANDATORY
6.4 CO₂ monitoring Every room >15 m² MANDATORY
6.8 Dwelling quarantine independence Private kitchen + bath + outdoor MANDATORY
7.1 Dual water distribution Potable + technical MANDATORY
7.2 Water main capacity 3× initial demand MANDATORY
8.1 Solar PV capacity ≥1.5 kWp/person MANDATORY
8.6 GSHP bore-field 50–100 boreholes MANDATORY
8.8 EV charging (all spaces) Pre-wired 7 kW MANDATORY
9.1 Fiber to every dwelling SM fiber, 2+2 spare strands MANDATORY
9.4 Server room 15–25 m², 2–5 kW MANDATORY
10.1 Primary utility corridor 1.8 m × 1.2 m walk-through MANDATORY
10.3 Spare conduit 2×100 mm every 10 m MANDATORY
11.5 Fire access distance ≤46 m to every wall MANDATORY
12.2 Party wall STC ≥55 airborne, ≥55 impact MANDATORY
13.2 Mechanical connections ≥80% bolted/screwed MANDATORY
13.3 Material passports Every element MANDATORY
14.1 Stormwater design 100-year ARI MANDATORY
14.5 Built-to-open ratio ≤25:75 MANDATORY

This document should be read alongside: Spatial Program & Masterplan Brief v2.0, Core Principles (17 principles), Cooperative Bylaws, Feasibility Study, and the project’s future-proofing analysis across climate, AI, demographics, and energy domains. Together these establish the complete design framework for any Kont settlement.


Open Questions

  • How will compliance verification be conducted during construction?
  • What mechanism will handle specification waivers or modifications for site-specific constraints?
  • How frequently should this standard be revised to reflect new technologies and climate projections?

Decisions Log

Decision 1: Climate Resilience Multiplier (2026-04-10)
Approved 100-year design return period for stormwater (currently 50-year in many jurisdictions). Rationale: 15–30% rainfall intensity increases projected by 2050 require today’s infrastructure to handle tomorrow’s climate extremes.

Decision 2: UAE Desalination (2026-04-10)
Elevated desalination from FUTURE-READY to MANDATORY for UAE settlements. Rationale: Water scarcity is immediate operational constraint, not optional future upgrade.

Decision 3: Material Passports (2026-04-10)
Mandated digital material passports on every building element. Rationale: Circular economy is foundational to multi-generational settlement viability. Digital twin integration enables dynamic resource tracking.


References

  • KONT-OPS-001: Spatial Program & Masterplan Brief v2.0
  • KONT-OPS-003: Core Principles (17-principle covenant)
  • KONT-OPS-004: Cooperative Bylaws & Governance Framework
  • KONT-REF-004: Future-Proofing Analysis (Climate, AI, Demographics, Energy)

Changelog

Version Date Changes Author
1.0 2026-04-10 Initial release. 14 sections, 200+ specifications, 2 appendices. All mandatory/recommended/future-ready levels defined. UAE-specific amendments added. Ahmet Turetmis